Example numbers are loaded to show how it works. Replace them with your own. Nothing you type leaves your browser.

Your line

Cases, bins, kilograms or litres. Use the rate when the line is running well.
What you lose for each unit not made. Usually the selling price less the materials and packaging you did not use.
100 if a lost hour is lost for good. Lower if you catch up with overtime or spare capacity.

People and other costs

Wage plus on-costs.
Scrapped product, clean-down and restart, call-out fees. Leave at 0 if there are none.

Stoppages

12 for a year-round plant. Fewer for a seasonal shed or vintage.

Your estimate

$0per year in unplanned downtime

Per month
$0
Per stoppage
$0
Per hour of downtime
$0
Downtime per month
0 hours
Downtime per year
0 hours

Where one stoppage's cost comes from

Lost margin
$0
Idle labour
$0
Other costs
$0

What cutting downtime is worth per year

10% less downtime
$0
25% less downtime
$0
50% less downtime
$0

Copy the numbers and paste them into the contact form. We will come back with a budget price for tracking your downtime and fixing the biggest causes.

How the numbers are worked out

The calculator adds up three costs for one stoppage, then multiplies by how often stoppages happen.

  • Hours per stoppageaverage length in minutes ÷ 60
  • Lost marginoutput per hour × hours per stoppage × share you can't make up × margin per unit
  • Idle labourpeople idle × labour cost per hour × hours per stoppage
  • Cost per stoppagelost margin + idle labour + other cost per stoppage
  • Cost per monthcost per stoppage × stoppages per month
  • Cost per yearcost per month × months of production per year

Results of $1,000 or more are rounded to three significant figures. Your inputs are estimates, so the answer is one too.

What the calculator leaves out

  • Late deliveries, penalties and lost customers
  • Overtime paid to catch up on lost output
  • Quality problems and rework after a restart
  • Repair labour and parts, unless you add them as an other cost
  • Extra wear on equipment from repeated stops and starts

All of these add to the real cost. Treat the result as a starting figure for a business case, not a full account.

Getting better numbers

Most plants know about their big breakdowns. Short stops are different. A jam that takes four minutes to clear rarely gets written down, so the number of stoppages and their average length are often guesses.

A plant monitoring system records every stop with a timestamp and asks the operator for the reason. Your figures then come from the machines, not from memory. See how we capture downtime on our plant intelligence page, which has a working demo you can run in your browser.

Line down right now? Don't fill in a form. Call 0427 997 730. We provide 24/7 breakdown support across the Riverina.

FAQs

Common questions about downtime cost

How do I work out the cost of downtime?

Add up the margin on the output you lose, the wages of people who can't work, and any direct costs such as scrap or a call-out. That is the cost of one stoppage. Multiply it by the number of stoppages in a month or a year. This calculator does that for you.

What should I use for margin per unit?

Use the selling price less the costs you avoid while the line is stopped, mainly raw materials and packaging. Don't subtract wages or overheads. You still pay those while the line is down.

What if we make up lost production with overtime?

Lower the "can't make up later" percentage to the share that is really lost. Then add the overtime you pay to catch up as an other cost per stoppage.

What counts as unplanned downtime?

Any stop you didn't schedule: breakdowns, jams, trips, waiting for materials, or waiting for someone to reset a fault. Planned maintenance, cleaning and changeovers are planned downtime and are not counted here.

How can I reduce unplanned downtime?

Start by measuring it. Record every stop, how long it lasted and why, then work on the causes that cost the most. AMC builds plant monitoring that captures this from your PLCs, and we fix the electrical and control faults behind the stops.

Does AMC see the numbers I enter?

No. The calculator runs in your browser and nothing you type is sent to us. We only see your numbers if you choose to send them.

Next step

Got a plant, machine or board that needs sorting?

Send us the scope, drawings or a few photos. An engineer reads every request and comes back within one business day with next steps and a clear, upfront price.

Project engineer or OEM? Send a P&ID, equipment list or scope for a budget price.

Call nowEmailGet a quote