Your estimate
$0saved per year
- Labour cost now, per year
- $0
- Labour cost after, per year
- $0
- Labour saving per year
- $0
- Total saving per year
- $0
- Simple payback
- Enter a system cost
- Five-year saving before system cost
- $0
What the saving would support
- System cost that pays back in 2 years
- $0
- System cost that pays back in 3 years
- $0
Copy the numbers and paste them into the contact form with your products and rates. We will come back with a budget price for a cell that suits your line.
How the numbers are worked out
This is a simple payback: the installed cost divided by the yearly saving. Most of the saving is the labour you no longer need on the palletising station.
- Palletising hours per yearshifts per day × paid hours per shift × production days per year
- Loaded hourly costhourly wage × (1 + on-costs %)
- Labour cost nowpeople per shift × palletising hours per year × loaded hourly cost
- Labour cost afterpeople still needed per shift × palletising hours per year × loaded hourly cost
- Total saving per yearlabour cost now − labour cost after + injury and turnover allowance − running cost
- Simple payback in monthsinstalled system cost ÷ total saving per year × 12
- Five-year savingtotal saving per year × 5 − installed system cost
Results of $1,000 or more are rounded to three significant figures.
What simple payback leaves out
- Finance costs, tax and depreciation. Ask your accountant how these apply to you
- Wage rises over the five years
- Extra output, if hand palletising is what holds the line back today
- Fewer damaged or unstable pallets
- Lost production while the cell is installed and commissioned
Some of these help the case and some hurt it. Use the result to decide whether a proper site review is worth doing. It is a rough guide, not a quote.
What moves the result most
Hours. A robot costs much the same whether the line runs one shift or three, so the more hours the line runs, the faster the payback. Product weight, case rate, the number of pallet patterns and the floor space all change the cost of the cell. Our guide explains what is involved and when robotic palletising makes sense.
FAQs
Common questions about palletising payback
How is the payback on a robotic palletiser worked out?
Divide the installed cost of the system by the yearly saving. The saving is mostly the labour you no longer need on the palletising station, less the cost of running the cell.
What should I enter as the system cost?
Use a quoted price or your own budget. Include the robot, gripper, conveyors, guarding, safety system, installation and commissioning. If you don't have a figure yet, send us your products, rates and layout and we can give you a budget price.
What is a good payback period for a palletising robot?
That is your call. Most businesses have their own limit for capital projects. Lines that run two or three shifts pay back faster than single-shift lines, because the same robot replaces more labour hours.
Does the robot replace everyone on the palletising station?
Not usually all of their time. Someone still supplies pallets and slip sheets, takes full pallets away and clears the odd fault. Enter that share in the "people still needed" box.
Should I include injury costs?
If hand palletising has caused strains, claims or high staff turnover at your site, yes. Use your own records. If you don't have figures, leave it at zero and treat it as an extra benefit.
Is this a quote?
No. It is a rough guide based on the numbers you enter. A real price and payback need a site review of your rates, products, space and line interfaces. Read our robotic palletising guide to see what that covers.
Next step
Got a plant, machine or board that needs sorting?
Send us the scope, drawings or a few photos. An engineer reads every request and comes back within one business day with next steps and a clear, upfront price.
Project engineer or OEM? Send a P&ID, equipment list or scope for a budget price.