24/7 breakdown support across the Riverina0427 997 730[email protected]

Home / PLC & SCADA / Legacy PLC migration

SVC · Legacy PLC & HMI migration

Obsolete PLC and HMI replacement: find your model

The legacy controllers and operator screens we are asked about most, what the manufacturer says about each one now, and the usual way off it.

Modernised automation panel with PLC and relaysAMC team reviewing a control panel with HMI before delivery

SVC · Legacy PLC & HMI migration · What we do

Old controls rarely fail at a convenient time.

Plenty of plants in food, beverage, agriculture and water still run on controllers the manufacturer has stopped making. They keep working, so the upgrade keeps getting put off. The real risk is not slow wear. It is a processor, power supply or screen failing in the middle of the season, with no new spare to buy and a program nobody has backed up.

This page is a starting point by model. Find your controller or screen in the table further down, see what the manufacturer says about it and where it usually migrates to, then follow the link to the detailed page. For the warning signs and how an upgrade runs in general, read our PLC upgrade guide.

AMC works on both ends of the job: legacy Allen-Bradley SLC 500, PLC-5 and MicroLogix controllers and PanelView screens, and the ControlLogix, CompactLogix, GuardLogix, Micro800 and FactoryTalk View systems that replace them. New panels are built and tested in our Griffith workshop before they go to site.

What we do

  • Legacy system audits and program backups
  • SLC 500 and PLC-5 migrations to Logix
  • MicroLogix controller replacements
  • PanelView and PanelView Plus screen replacements
  • Staged cutovers with a rollback plan
  • New panels built and tested in our workshop
  • Updated drawings, I/O lists and backups
  • Fault finding on legacy systems until they are replaced

Standards, platforms & tools

RSLogix 5RSLogix 500Studio 5000ControlLogixCompactLogixGuardLogixPanelView PlusFactoryTalk View

Legacy families

Pick your platform.

Each family has its own traps. These pages go into the detail.

01

SLC 500

Rack-based 1747 processors and 1746 I/O. Rockwell points SLC 500 users to CompactLogix 5380. See the SLC 500 and PLC-5 migration guide.

02

PLC-5

1785 processors and 1771 I/O, often on DH+ and Remote I/O. The usual target is ControlLogix. Covered in the same migration guide.

03

MicroLogix

Small 1000, 1100, 1200, 1400 and 1500 controllers on machines, skids and pump boards. See MicroLogix replacement options.

04

PanelView screens

PanelView Standard, PanelView Plus and Plus 6 operator terminals. See PanelView HMI replacement.

05

Siemens S5 and S7-300

S5 is long out of production, and Siemens ended standard new sales of the S7-300 in October 2025. Check Siemens Industry Online Support for the current dates, then ask us about the options.

06

Modicon, Omron and others

The pattern is the same: check the maker's lifecycle notice, back up the program, then plan the move. Start with the PLC upgrade guide.

Where to start

Three things to do this month, whatever you run.

You don't need an approved project to cut the risk. Three small jobs make every later decision easier.

First, get a verified backup of every PLC and HMI program and keep a copy somewhere other than the old laptop. Second, write down the catalogue number and series of every processor, I/O module, comms module and screen, and look each one up on the manufacturer's lifecycle page. Third, work out which single failure would stop the plant for longest. That is usually where a staged migration should start.

  • Back up every PLC and HMI program
  • List catalogue numbers and series letters
  • Check the lifecycle status of each part
  • Count the spares you actually hold
  • Find the single points of failure
  • Plan the first stage around a shutdown

Proof

See it on the job.

AMC replaces outdated controls with modern PLCs, drives and operator screens, often in staged cutovers so the plant keeps running during the upgrade.

Where we work

Griffith-based. Riverina and Australia-wide.

We migrate legacy control systems for sites across the Riverina and Australia-wide. Programs are converted and tested in Griffith, then commissioned on your site.

GriffithLeetonYendaHanwoodYoogaliNarranderaDarlington PointColeamballyHayHillstonWagga WaggaMildura

Lifecycle lookup

Legacy Allen-Bradley families at a glance

Status last checked on Rockwell Automation's website on 15 November 2026. It changes over time and differs by catalogue number, so look up your exact part on Rockwell's Product Lifecycle Status page before you decide anything.

FamilyCatalogue numbersWhat Rockwell's site saysUsual replacementMore
PLC-51785 processors, 1771 I/ODiscontinued. Rockwell offers a migration path to ControlLogix.ControlLogixMigration guide
SLC 5001747 processors, 1746 I/OSome bulletin numbers are discontinued, including SLC 5/01, 5/02 and 5/03 8K controllers. Rockwell encourages migration.CompactLogix 5380Migration guide
MicroLogix 11001763Discontinued and no longer available for sale.Micro800, or a small CompactLogixMicroLogix options
MicroLogix 15001764Discontinued and no longer available for sale.See the MicroLogix pageMicroLogix options
MicroLogix 1000 and 12001761, 1762Older models. Look up your catalogue number.Micro800, or a small CompactLogixMicroLogix options
MicroLogix 14001766Not shown as discontinued on its product page when we checked. Rockwell publishes a MicroLogix to Micro800 migration guide.Micro800, or a small CompactLogixMicroLogix options
PanelView Standard2711Legacy terminals. Rockwell publishes a conversion guide to PanelView Plus 7.PanelView Plus 7PanelView options
PanelView Plus and Plus 62711PRockwell publishes migration guides to PanelView Plus 7. Look up your catalogue number.PanelView Plus 7PanelView options

What the status words mean

Rockwell uses four hardware statuses. Active is the current offering. Active Mature is still fully supported, but a newer product exists. End of Life means a discontinue date has been announced, so it is time for last buys and a migration plan. Discontinued means the product is no longer made, although repair or exchange may still be offered. Other manufacturers use different words for the same stages.

Siemens, Modicon, Omron and other brands

The same approach applies to other makes. Siemens S5 is long out of production, and Siemens announced the phase-out of the S7-300 and its ET 200M I/O in October 2023 and ended standard new sales in October 2025, with spare parts supported for a period after that. Siemens lists the current milestone dates on its Industry Online Support site. For older Schneider Modicon and Omron controllers, check the manufacturer's own lifecycle notice for your part number. We work with these platforms as well as Allen-Bradley. Start with the PLC upgrade guide and send us the details.

Risks of staying

What an obsolete system really costs you.

  • No new spares, only second-hand parts of unknown history at rising prices
  • Programming software that only runs on one old laptop
  • One person who knows the system, or nobody
  • No tested backup, or a backup that doesn't match what is running
  • Old networks and screens that can't connect to new drives, SCADA or reporting
  • A failure in peak season turns a planned job into an emergency

For a quote

What to send us.

  • Photos of each panel with the doors open, and of the PLC, I/O racks and screens
  • Catalogue numbers and series letters for processors, I/O, comms modules and HMIs
  • The PLC and HMI program files, if you have them (tell us if you don't)
  • Electrical drawings and I/O lists, even if they are out of date
  • What else talks to the PLC: drives, SCADA, other PLCs, weighers, printers
  • When you can shut down, and for how long

Send it through our contact page or call 0427 997 730. If you don't have half of this, send what you have.

FAQs

Common questions

How do I find out if my PLC is obsolete?

Find the catalogue number and series letter on the label of the processor or module, then look it up on the manufacturer's lifecycle page. For Allen-Bradley, use Rockwell Automation's Product Lifecycle Status search. It shows each part as Active, Active Mature, End of Life or Discontinued.

Is it safe to keep running a discontinued PLC?

A PLC does not stop working because its status changes. The risk is what happens when a part fails: there may be no new spare, and a repair or second-hand part takes time to find. If the plant can't afford that stop, plan the migration before the failure.

Should we buy spares or migrate?

Spares buy time, and they are worth holding for a system you plan to replace in the next few years. They don't fix lost software, missing backups or a system nobody can support. Most sites do both: hold the key spares and migrate in stages.

Which legacy platforms does AMC work with?

Mostly Allen-Bradley: SLC 500, PLC-5 and MicroLogix controllers and PanelView screens, migrated to ControlLogix, CompactLogix, GuardLogix and FactoryTalk View. We also work with Siemens, Schneider Modicon and Omron systems. See PLC and SCADA programming.

Can a migration be done without a long shutdown?

Usually. The program is converted and tested in our workshop first, new panels are pre-built, and the changeover is staged over planned stops with the old system kept ready to go back to. Our PLC upgrade guide explains how a cutover runs.

Do you work outside the Riverina?

Yes. We are based in Griffith and deliver migrations Australia-wide. See Australia-wide projects.

Next step

Got a plant, machine or board that needs sorting?

Send us the scope, drawings or a few photos. An engineer reads every request and comes back within one business day with next steps and a clear, upfront price.

Project engineer or OEM? Send a P&ID, equipment list or scope for a budget price.

Call nowEmailGet a quote